31. Where, during the period of validity of a permit, a tank is added or replaced or other material changes are made to other parts of petroleum equipment, thereby invalidating the permit or inspection certificates issued, the permit shall be amended or replaced by a new permit, at the option of the permit holder.
If the permit holder opts for an amended permit, the permit holder must provide the Minister with an inspection certificate for the new equipment, in accordance with the regulatory standards, and pay any additional amount of fees applicable.
If the permit holder opts for a new permit, the application shall be dealt with as an application for renewal.
1987, c. 80, s. 31; 1997, c. 64, s. 2.